
Same pack format shown for reference. See the specification below for this concept.
View configuration diagram
Gummies 4 g/gummy | Stand-up pouch
4 g/gummy · Stand-up pouch. A gusseted base supports upright display.
Specifications
| Format | Gummies |
|---|---|
| Unit size | 4 g/gummy |
| Pack | Stand-up pouch |
| Pack count | To be confirmed by a pack trial |
| Materials | Flexible film; layers and thickness to confirm |
Overview
4 g/gummy · Stand-up pouch · To be confirmed by a pack trial. Check dispensing and sticking with the intended gummy size and finish. Trial the bottom gusset and side seals with a filled pouch.
Pack-out is open. Trial the 4 g/gummy unit in the intended pack before setting the sale quantity.
Flexible film; layers and thickness to confirm. Check dispensing and sticking with the intended gummy size and finish. Trial the bottom gusset and side seals with a filled pouch.
Tell us the destination market, sales channel, pack count and sampling needs so Sparder can assess format and packaging fit.
Service process
Three ways to work with us. One process from brief to delivery.
How we work together
- A
Full-service development
Sparder coordinates formulation, packaging and production.
- B
Customer-supplied formula
You provide the formula. Sparder handles production and packing.
- C
Customer-supplied materials
You provide ingredients or semi-finished goods. Sparder processes and packs them.
Seven project steps
- 01Brief and feasibility
Project brief
Confirm format, packaging, target market and expected volume.
Confirmed brief
- 02Brief and feasibility
Proposal and quote
Review specifications, packaging and process feasibility.
Proposal and quote
- 03Sampling and approval
Sample development
Adjust the formula and produce initial samples.
Samples, quantity agreed by project
- 04Sampling and approval
Sample approval
Refine the samples with your feedback and approve a reference sample.
Sample approval
- 05Production and delivery
Order and scheduling
Confirm the contract and packaging availability, then schedule production.
Production schedule
- 06Production and delivery
Production and testing
Manufacture to approved specifications and perform in-process checks.
Batch and inspection records
- 07Production and delivery
Quality release and shipping
Inspect finished goods, pack them for shipment and arrange delivery.
COA or shipping documents, as agreed